Public Works.

We will coordinate 50 miles of paving across city, county, and state roads, work toward repairing routine potholes within one week, improve 20 dangerous intersections, and reduce missed trash collections. We will expand GOTrenton!, reduce recurring dumping, plant 1,000 trees, and advance the Route 29 plan to better connect neighborhoods with the riverfront.

  1. 1

    Repave 50 miles of city, county and state roads

    How we will do it
    Public Works and Engineering will coordinate with Mercer County and NJDOT on a four-year paving program covering roads within Trenton. We will publish planned mileage by road owner, pursue eligible funding and align paving with water, sewer and utility work. Annual reporting will distinguish completed work from projects awaiting funding or construction.
    Why it works
    Residents travel across roads maintained by different governments. Coordinating their schedules will extend improvements across the network, while completing underground work first will protect new pavement.
  2. 2

    Build toward repairing newly reported routine potholes within one week

    How we will do it
    Our Streets Division will test spray-injection patching against existing methods on comparable roads, measuring durability, repairs per crew-hour and total cost, including repeat repairs. We will use the results to select equipment and organize routes by location. Dangerous defects will receive immediate attention, while repair records will show progress toward the one-week standard.
    Why it works
    A faster repair only saves money if it lasts. Testing both productivity and durability will help the city increase repair capacity without creating more repeat visits.
  3. 3

    Make 20 high-injury intersections safer for everyone

    How we will do it
    Engineering will improve five intersections annually, using our Vision Zero analysis to match treatments to collision patterns. Earlier pedestrian signals will address turning conflicts, shorter crossings will reduce exposure, and lighting or visibility improvements will address locations where drivers cannot adequately see people crossing.
    Why it works
    Giving pedestrians a three-to-seven-second head start establishes their presence before vehicles turn, a measure FHWA associates with approximately 13% fewer pedestrian-vehicle crashes. Where geometry is the problem, temporary materials will allow us to evaluate turning speeds and accessibility before permanent construction.
    Already done
    Working with DVRPC, we have developed a Trenton Vision Zero Plan that translates safer-streets priorities into a framework for investment.
  4. 4

    Reach 150,000 GOTrenton! passenger trips

    How we will do it
    We will help GOTrenton! recruit employers, healthcare providers, colleges and community organizations as service partners across Mercer County. Partners will identify recurring trips and contribute through service agreements, while booking software will group compatible journeys and align vehicle hours with demand. We will track trips per vehicle-hour, waiting times and operating cost per passenger.
    Why it works
    Employees arriving for similar shifts, patients traveling to nearby appointments and students heading toward the same campus can generate overlapping journeys. Pooling those trips allows vehicles to carry more people without a proportional increase in driver hours or mileage. Reliable partner demand can support capacity that also serves other residents, improving access to work and healthcare.
    Already done
    GOTrenton! expanded into parts of Ewing and Hamilton in May 2026. The annual target represents approximately 411 passenger trips per calendar day.
  5. 5

    Reduce verified missed-collection complaints by 20% each year

    How we will do it
    Sanitation will establish a baseline of verified missed collections, linking duplicate complaints to the same incident. Crews will report breakdowns and unfinished blocks during their shifts, and supervisors will assign available relief vehicles and staff. We will compare complaint records with route-completion records and publish the annual reduction.
    Why it works
    Early reporting gives supervisors time to recover unfinished routes. Reviewing recurring misses will reveal where vehicle reliability, staffing or route design needs attention. Progress will mean fewer missed collections, rather than simply fewer recorded calls.
  6. 6

    Bring 85% of roadways to fair or better condition

    How we will do it
    Engineering will maintain a consistent pavement-condition inventory and coordinate improvement priorities with county and state road owners. The annual program will combine resurfacing and reconstruction with crack sealing and drainage repairs where those treatments can preserve usable pavement.
    Why it works
    Different road conditions require different treatments. Preserving streets before they fail will allow more of the network to improve while reconstruction funding addresses the roads with the greatest structural needs.
  7. 7

    Cut recurring illegal-dumping hotspots by 75%

    How we will do it
    Public Works will establish a baseline of recurring locations and coordinate cleanup with barriers, lighting, targeted cameras and owner enforcement. Inspectors will revisit treated sites and nearby blocks to check for recurrence or displacement. We will pursue penalties and the seizure or forfeiture of vehicles used in illegal dumping where authorized by law.
    Why it works
    Removing a pile does not prevent the next delivery. Combining cleanup with prevention and enforcement will address the conditions that allow repeated dumping.
  8. 8

    Plant 1,000 trees and achieve an 85% three-year survival rate

    How we will do it
    We will plant 250 trees annually from 2027 through 2030, prioritizing blocks with limited shade and suitable growing space. Projects will include watering, inspections and replacement provisions. Each planting group will be monitored for three years, including beyond 2030 where necessary.
    Why it works
    Planting creates lasting shade only when trees survive. Appropriate species, adequate rooting space and establishment care will protect the investment and improve neighborhood walking conditions.
  9. 9

    Finalize the Route 29 redesign and prepare a first-phase implementation plan

    How we will do it
    We will work with Mercer County, NJDOT, DVRPC, relevant state agencies and federal partners to advance the preferred design and define a practical first phase. The implementation plan will identify engineering requirements, environmental approvals, land responsibilities, costs and potential funding sources.
    Why it works
    A defined first phase gives transportation agencies a project they can evaluate and fund. Coordinating that work with riverfront redevelopment will improve access without requiring the entire corridor to be rebuilt at once.
  10. 10

    Support quarterly cleanups in every ward

    How we will do it
    Our Clean Communities coordinator will organize four cleanups annually in each ward, providing supplies and scheduled hauling. Participating groups will be eligible for awards of up to $500 per event, with up to $8,000 annually reserved for the 16 events and separate provision for equipment and disposal.
    Why it works
    Neighborhood groups can organize volunteers while the city provides the supplies and removal services needed to finish the work. A regular schedule will also help identify locations requiring enforcement or permanent improvements.
  11. 11

    Repair or replace five miles of sidewalks by 2030

    How we will do it
    Engineering will deliver five miles of sidewalk repairs and replacement by 2030, averaging 1.25 miles annually. We will prioritize hazardous conditions and routes to schools, transit, senior services and neighborhood destinations. We will pursue CDBG funding and congressional appropriations and coordinate construction with street and utility improvements.
    Why it works
    Continuous, usable sidewalks will make daily trips safer, particularly for residents using wheelchairs, mobility aids or strollers. Coordinating construction will reduce repeated excavation and protect completed improvements.
  12. 12

    Advance reconstruction of MLK Jr. Boulevard and Southard Street

    How we will do it
    We will advance the Complete and Green Streets reconstruction of Martin Luther King Jr. Boulevard between Pennington Avenue and Calhoun Street, and Southard Street between Calhoun Street and Brunswick Avenue. Engineering will complete design work and establish the construction sequence, bringing street reconstruction, pedestrian improvements and placemaking into one coordinated project.
    Why it works
    Rebuilding the corridor as a connected project will allow road conditions, pedestrian access and public space to improve together. Completing design and engineering before construction will help coordinate the work and reduce avoidable disruption.
    Already done
    The city has invested approximately $500,000 in planning and engineering and submitted an application for $8.5 million in congressional funding for 2027.